作者zxc906383 (無無)
看板MLB
標題[情報] 光芒要負擔約七億鎂的新球場成本
時間Wed Sep 20 09:37:16 2023
https://reurl.cc/E1p2p1
If approved, the team will pay $700 million, and the city and county will split
$600 million. The plan is to break ground next fall, with the fixed-roof domed s
tadium to open in 2028.
光芒新巨蛋球場確切花費是要13億美金
其中光芒要負擔7億美金、市府負擔6億美金
而如果後來有超支的話,一樣是由光芒球團吸收
The stadium, part of massive $6.5 billion, 20-year redevelopment of the 86-acre
Historic Gas Plant District led by the global Hines Co., would seat around 30,00
0 under a pavilion-style fixed roof. It would have an artificial turf field, air
conditioning, some windows and “operable walls to bring the outside in,” plus
what the team says will be state-of-the-art amenities for fans and players.
容量30000人+人工草皮+固定屋頂
The financing plan calls for the city and county to split an approximate $600 mi
llion public contribution, with the Rays covering the remaining $700 million, pl
us any cost overruns.
球場是65億美金周邊開發的一部分
The overall redevelopment plan includes 14,000 parking spaces; 4,800 market rate
residential units, plus 600 at affordable/work force prices and 600 for seniors
; 1.4 million square feet of office and medical space; 750 hotel rooms; 750,000
square feet of retail space; a concert venue with a capacity of 3,000-4,000; and
a new home for the Woodson African American Museum of Florida.
14,000個停車位
140萬平方英尺的辦公和醫療空間
750間飯店客房
750,000平方英尺的零售空間
可容納3,000-4,000人的音樂會場地
One change from the original plan was to increase the number of affordable housi
ng units nearly 50%, from 859 to 1,200, which was a priority for Welch. There no
w will be 600 units on site — including 100 designated for seniors, allowing th
e potential for residents displaced from the site when Tropicana Field was built
to move back — and 600 off-site at a location to be determined.
還有1200個affordable housing
Hines senior managing partner Michael Harrison said about 20% of the redevelopme
nt should be in place when the stadium opens, including ground level retail, foo
d and beverage outlets on the parcels east of Booker Creek, some of the market p
lace and affordable housing units, a full-service hotel with conference space an
d the first office building.
大約20%的周邊開發在光芒新球場落成時會蓋好
The biggest question is why the Rays would build a new stadium on essentially th
e same site when attendance has lagged for much of their first 26 seasons.
至於被問到為啥新球場還是蓋在St. Petersburg
Auld said the recent building boom and influx of new residents in downtown St. P
etersburg — with projections for more, including 6,000 units as part of their r
edevelopment project — changed the calculus.
光芒:當地人越來越多啦+周邊開發能讓人更多
https://i.imgur.com/BglgZD8.jpg
https://i.imgur.com/AqdXqre.jpg
https://i.imgur.com/W7xNjHL.jpg
https://i.imgur.com/aTRYWY7.jpg
光芒:有周圍開發當然留在這啦XD
--
※ 發信站: 批踢踢實業坊(ptt.cc), 來自: 140.122.136.4 (臺灣)
※ 文章網址: https://www.ptt.cc/bbs/MLB/M.1695173838.A.D65.html
推 IVIVI: 光芒老闆:聯開案先炒一波 炒完還是沒人再賣球隊XD 09/20 20:04
推 Shianer: 推 09/20 21:05
推 acerow83: 有開發案可以承包 很懂 09/20 21:08
推 Rundstedt: 炒地皮發大財囉 09/20 23:07
推 ckranger: 感覺過幾年會看到還是沒球迷的新聞 09/21 08:11
推 Chricey: 我阿嬤說吃豬腳補關節,豬腳吃起來 09/21 08:11