看板 MLB
https://reurl.cc/E1p2p1 If approved, the team will pay $700 million, and the city and county will split $600 million. The plan is to break ground next fall, with the fixed-roof domed s tadium to open in 2028. 光芒新巨蛋球場確切花費是要13億美金 其中光芒要負擔7億美金、市府負擔6億美金 而如果後來有超支的話,一樣是由光芒球團吸收 The stadium, part of massive $6.5 billion, 20-year redevelopment of the 86-acre Historic Gas Plant District led by the global Hines Co., would seat around 30,00 0 under a pavilion-style fixed roof. It would have an artificial turf field, air conditioning, some windows and “operable walls to bring the outside in,” plus what the team says will be state-of-the-art amenities for fans and players. 容量30000人+人工草皮+固定屋頂 The financing plan calls for the city and county to split an approximate $600 mi llion public contribution, with the Rays covering the remaining $700 million, pl us any cost overruns. 球場是65億美金周邊開發的一部分 The overall redevelopment plan includes 14,000 parking spaces; 4,800 market rate residential units, plus 600 at affordable/work force prices and 600 for seniors ; 1.4 million square feet of office and medical space; 750 hotel rooms; 750,000 square feet of retail space; a concert venue with a capacity of 3,000-4,000; and a new home for the Woodson African American Museum of Florida. 14,000個停車位 140萬平方英尺的辦公和醫療空間 750間飯店客房 750,000平方英尺的零售空間 可容納3,000-4,000人的音樂會場地 One change from the original plan was to increase the number of affordable housi ng units nearly 50%, from 859 to 1,200, which was a priority for Welch. There no w will be 600 units on site — including 100 designated for seniors, allowing th e potential for residents displaced from the site when Tropicana Field was built to move back — and 600 off-site at a location to be determined. 還有1200個affordable housing Hines senior managing partner Michael Harrison said about 20% of the redevelopme nt should be in place when the stadium opens, including ground level retail, foo d and beverage outlets on the parcels east of Booker Creek, some of the market p lace and affordable housing units, a full-service hotel with conference space an d the first office building. 大約20%的周邊開發在光芒新球場落成時會蓋好 The biggest question is why the Rays would build a new stadium on essentially th e same site when attendance has lagged for much of their first 26 seasons. 至於被問到為啥新球場還是蓋在St. Petersburg Auld said the recent building boom and influx of new residents in downtown St. P etersburg — with projections for more, including 6,000 units as part of their r edevelopment project — changed the calculus. 光芒:當地人越來越多啦+周邊開發能讓人更多 https://i.imgur.com/BglgZD8.jpg
https://i.imgur.com/AqdXqre.jpg
https://i.imgur.com/W7xNjHL.jpg
https://i.imgur.com/aTRYWY7.jpg
光芒:有周圍開發當然留在這啦XD -- ※ 發信站: 批踢踢實業坊(ptt.cc), 來自: 140.122.136.4 (臺灣) ※ 文章網址: https://www.ptt.cc/bbs/MLB/M.1695173838.A.D65.html
IVIVI: 光芒老闆:聯開案先炒一波 炒完還是沒人再賣球隊XD 09/20 20:04
Shianer: 推 09/20 21:05
acerow83: 有開發案可以承包 很懂 09/20 21:08
Rundstedt: 炒地皮發大財囉 09/20 23:07
ckranger: 感覺過幾年會看到還是沒球迷的新聞 09/21 08:11
Chricey: 我阿嬤說吃豬腳補關節,豬腳吃起來 09/21 08:11